Login | Register
My pages Projects Community openCollabNet

The Tigris site will receive a major upgrade the evening of Monday, December 1, beginning at 8:30 pm PST. Downtime is projected to be about ten hours. Further details in the announcement

1.4. Assumptions

This release of the manual assumes the reader is very familiar with UML already. This is reflected in the sparseness of the description of UML concepts in the tutorial.

The case study is described, but not yet fully realized throughout the tutorial. This will be achieved in future releases of the manual.